Améliorations des systèmes d'échappement à l'atelier de Benton Ridge
Résumé public
Généré ou condensé à partir du texte source importé. Vérifiez avant de soumissionner.
AAFC appears to be seeking a qualified contractor for ventilation and life-safety improvements in the vehicle service bay of Building 1 at the Benton Ridge facility. The work may include supplying, installing, testing, and commissioning general exhaust ventilation, vehicle exhaust capture systems, welding-fume collection, gas detection, and related controls. The stated goal is to improve air quality and worker safety and support compliance with applicable codes and standards. This is a two-phase selection process. In Phase One, interested suppliers will be assessed on their qualifications. Suppliers that are selected may then be invited in Phase Two to submit a financial bid based on the project specifications and drawings. The tender is currently listed as open and closes October 2, 2026, at 2:00 p.m.; the time zone is not specified in the provided information. The location information appears inconsistent, listing New Brunswick, Montreal, and Quebec, while the province field indicates Quebec. Confirm the actual work location, site-visit requirements, mandatory qualifications, insurance, bonding, experience, submission instructions, and evaluation criteria in the official tender notice before deciding whether to participate.The available tender document is: https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/106752/%28eng-construction-phase-1---benton-ridge-%282627-107.pdf
Aperçu des exigences
Un profil débloque la liste de vérification complète et l’explication de correspondance.
- This appears to be Phase One of a two-phase selection process. Interested suppliers are expected to have their qualifications evaluated in Phase One.
- Only suppliers qualified through Phase One will potentially be invited to submit a financial bid in Phase Two.
- The anticipated contractor scope includes ventilation and life-safety upgrades within the vehicle service bay of Building #1.
- The work appears to include supplying, installing, testing, and commissioning new systems for: general exhaust ventilation, vehicle source-capture exhaust extraction, welding fume collection, gas detection, and associated controls.
Aperçu de la description source
Le texte source importé peut contenir la mise en forme de l’avis original.
PROCESSUS DE SÉLECTION EN DEUX PHASES Il s’agit de la première phase (phase 1) d’un processus en deux phases : la première évaluera les qualifications de tous les fournisseurs intéressés; la deuxième (phase 2) invitera les fournisseurs qualifiés à présenter une soumission financière pour le projet en fonction des spécifications et des dessins. AAC recherche un entrepreneur qualifié pour réaliser des travaux de mise à niveau de la ventilation et des systèmes de sécurité des personnes dans l'aire d'entretien des véhicules du bâtiment n° 1. Les travaux comprennent la fourniture, l'installation, les essais et la mise en service de nouveaux systèmes, incluant la ventilation générale par extraction, l'extraction des gaz d'échappement à la source, le captage des fumées de soudage, la détection de gaz et les systèmes de commande associés. L'objectif du projet est d'améliorer la qualité de l'air et la sécurité des travailleurs, ainsi que de rendre l'installation conforme aux codes et normes en vigueur.
Transformez cet avis en décision de soumission.
Créez un profil d’entreprise pour débloquer le score de correspondance, les explications, les prochaines étapes, le suivi des occasions sauvegardées et les alertes.
