Analyse des options pour le complexe, réserve de parc national Pacific Rim
Résumé public
Généré ou condensé à partir du texte source importé. Vérifiez avant de soumissionner.
Parks Canada Agency appears to be seeking an engineering or architecture consultant for an options analysis related to a proposed new asset compound at Pacific Rim National Park Reserve in British Columbia.The work would potentially include: comparing building options, preparing a life-cycle cost analysis for the main building, developing schematic site plans, and completing a preliminary geotechnical investigation. Subject to funding, optional work may include a climate-change risk analysis and preliminary drawings. The proposed site is near the existing PRNPR administration buildings at approximately 49.060149, -125.722714. The tender record lists British Columbia and Calgary, Alberta, so the exact delivery and administrative requirements should be confirmed in the official documents.Buyer: Parks Canada Agency Status: Open Closing date: November 3, 2026, at 3:00 p.m. [time zone should be verified]Category: Services This opportunity may be relevant to firms with appropriate engineering, architecture, site-planning, geotechnical, and life-cycle-costing experience. The available documents include the RFP, Statement of Work, and Integrity Verification Form. A business should review the complete official tender notice and all attached documents to confirm mandatory qualifications, submission instructions, insurance and security requirements, evaluation criteria, contract terms, and the applicable closing time before deciding whether to submit a bid. Bid Maple is not affiliated with the Government of Canada.
Aperçu des exigences
Un profil débloque la liste de vérification complète et l’explication de correspondance.
- An engineering or architecture consultant appears to be required for an options analysis concerning a new asset compound at Pacific Rim National Park Reserve (PRNPR).
- The work is expected to compare different building types for the proposed asset compound.
- The scope includes a Life Cycle Cost Analysis for the primary building.
- The scope includes preparation of schematic site plans.
Aperçu de la description source
Le texte source importé peut contenir la mise en forme de l’avis original.
L’Agence Parcs Canada (APC) recherche un consultant en génie ou en architecture pour réaliser une analyse des options en vue de la construction d’un nouveau complexe de biens au sein de la réserve de parc national Pacific Rim (RPNPR). La RPNPR loue actuellement deux bâtiments situés à l’extérieur de la réserve de parc et envisage plutôt d’aménager la zone entourant les bâtiments administratifs existants de la RPNPR, situés aux coordonnées suivantes : 49.060149403918174, -125.72271370346736. Le consultant réalisera une analyse des options comparant différents types de bâtiments, une analyse des coûts du cycle de vie pour le bâtiment principal, des plans schématiques du site et une étude géotechnique préliminaire. En fonction des fonds disponibles, APC pourra étendre le contrat afin d’y inclure certains services optionnels, notamment une analyse des risques liés aux changements climatiques et des dessins préliminaires.
Transformez cet avis en décision de soumission.
Créez un profil d’entreprise pour débloquer le score de correspondance, les explications, les prochaines étapes, le suivi des occasions sauvegardées et les alertes.
