This appears to be an open PSPC tender for work at Building D175 at the Halifax Dockyard in Nova Scotia. The requirement involves selective demolition and installing or modifying cooling systems serving two blast booths, along with related changes to building components and other systems. The work is expected to be completed within 42 weeks after contract award. The solicitation is stated to be open only to Canadian suppliers. The closing date is October 28, 2026, at 2:00 p.m. The listing shows an unusual location/province combination—Nova Scotia and Gatineau, Quebec, with province listed as Quebec—and no official notice or tender documents were provided. A business considering this opportunity should review the complete official tender notice for site requirements, mandatory qualifications, security or safety conditions, bonding, insurance, submission instructions, and the authoritative closing time before deciding whether to bid.
Aperçu des exigences
Un profil débloque la liste de vérification complète et l’explication de correspondance.
- The requirement is for selective demolition and implementation of cooling systems serving two blast booths in Building D175 at the Halifax Dockyard, including ancillary modifications to systems and building components.
- The work is to be completed within 42 weeks of contract award.
- The solicitation is stated to be open only to Canadian suppliers.
- The tender status is listed as open, with a closing date and time of October 28, 2026 at 14:00; the applicable time zone is not specified and should be verified in the official tender notice.
Aperçu de la description source
Le texte source importé peut contenir la mise en forme de l’avis original.
Services publics et Approvisionnement Canada (SPAC) au nom du ministère de la Défense nationale (MDN) a besoin d’une démolition sélective et de la mise en œuvre de systèmes de refroidissement desservant deux cabines de sablage, y compris des modifications auxiliaires aux systèmes et aux composants de construction situés dans le bâtiment D175 de l’arsenal de Halifax. Les travaux doivent être achevés dans les 42 semaines suivant l’attribution du contrat. La présente demande de soumissions n’est ouverte qu’aux fournisseurs canadiens.
Transformez cet avis en décision de soumission.
Créez un profil d’entreprise pour débloquer le score de correspondance, les explications, les prochaines étapes, le suivi des occasions sauvegardées et les alertes.