This appears to be an open two-phase construction opportunity from Public Works and Government Services Canada for sanitary sewer repairs at the National Forestry Centre in Edmonton. The work potentially includes installing new sanitary sewer piping beneath an existing concrete floor, excavation, concrete and floor restoration, working around existing infrastructure, and site cleanup. The successful contractor would be expected to complete the work within 30 weeks after acceptance of the offer. In Phase One, PSPC will assess supplier qualifications. Suppliers that are selected may then be invited in Phase Two to submit a financial bid based on the project specifications and drawings. This means a price is not necessarily requested at the initial stage. The stated closing deadline is October 20, 2026, at 2:00 p.m. Late submissions will not be accepted. The listing identifies Edmonton as the project location, although the location field also references Gatineau, Quebec, so this should be confirmed in the official notice. A potentially relevant business would likely need experience and capacity for commercial or institutional sewer construction and interior restoration work, but the exact mandatory requirements are not provided here. Review the official tender notice and all procurement documents for qualification criteria, submission instructions, security or insurance requirements, drawings, specifications, site conditions, and the correct closing time and time zone before deciding whether to respond.Official source: https://portal.us.bn.cloud.ariba.com/dashboard/public/appext/comsapsbncdiscoveryui#/Rfx Event/preview/1110026806?an Id=ANONYMOUS
Aperçu des exigences
Un profil débloque la liste de vérification complète et l’explication de correspondance.
- Submit the Phase One response by October 20, 2026 at 14:00. Late submissions will not be considered or accepted.
- Participate in a two-phase process: Phase One evaluates supplier qualifications; qualified suppliers may be invited in Phase Two to submit a financial bid.
- The work appears to include interior sanitary sewer repairs at the National Forestry Centre (NRCan) in Edmonton.
- The scope appears to include installing new sanitary sewer piping beneath the existing concrete floor, associated excavation, concrete/floor restoration, work around existing infrastructure, and site cleanup.
Aperçu de la description source
Le texte source importé peut contenir la mise en forme de l’avis original.
Veuillez noter que les soumissions en retard ne seront ni prises en compte ni acceptées. Voici la première phase (phase 1) d’un processus en deux phases. La phase 1 évaluera les compétences de tous les soumissionnaires intéressés et la deuxième phase (phase 2) invitera les fournisseurs retenus à la phase 1 à transmettre une soumission financière pour le projet d’après les devis et les dessins. Les travaux consistent à réparer l’égout sanitaire intérieur au Centre national de foresterie (RNCan), y compris l’installation d’une nouvelle tuyauterie d’égout sanitaire sous le plancher en béton existant, l’excavation connexe et la restauration du béton et du plancher, les travaux autour de l’infrastructure existante et le nettoyage du site.
Transformez cet avis en décision de soumission.
Créez un profil d’entreprise pour débloquer le score de correspondance, les explications, les prochaines étapes, le suivi des occasions sauvegardées et les alertes.