F7049-260142 - NGCC Tully - Dessalinisateur à osmose inverse
Résumé public
Généré ou condensé à partir du texte source importé. Vérifiez avant de soumissionner.
This appears to be an open PSPC procurement for the Canadian Coast Guard’s CCGS John P. Tully. The requirement is for two reverse osmosis water makers, including supply and installation. Equipment must be delivered to Sidney, British Columbia, by October 31, 2027. The contract term is expected to be three years after award, with options for the Coast Guard to purchase additional water makers during that period. The successful offer will be selected through SAP Ariba based on a combined evaluation of technical merit and price. The tender lists British Columbia and Gatineau, Quebec as locations and is scheduled to close on November 20, 2026, at 2:00 p.m. The category is identified as GD, but the provided summary does not include detailed technical specifications, installation requirements, mandatory criteria, security requirements, or submission instructions. This opportunity may be relevant to businesses that supply and install marine or industrial reverse osmosis water-making systems and can meet the delivery, technical, and contractual requirements. Review the complete official tender notice and SAP Ariba documents for the precise specifications, evaluation method, deadlines, and bidder instructions before deciding whether to submit an offer: https://portal.us.bn.cloud.ariba.com/dashboard/public/appext/comsapsbncdiscoveryui#/Rfx Event/preview/1110030096?an Id=ANONYMOUS
Aperçu des exigences
Un profil débloque la liste de vérification complète et l’explication de correspondance.
- Supply and install two reverse osmosis water makers for the Canadian Coast Guard vessel CCGS John P. Tully.
- Deliver the water makers to Sidney, British Columbia, by October 31, 2027.
- The resulting contract is expected to run for three years from contract award.
- The requirement may include options for the purchase of additional water makers during the three-year contract period.
Aperçu de la description source
Le texte source importé peut contenir la mise en forme de l’avis original.
La Garde côtière canadienne a besoin de se faire fournir et installer deux dessalinisateur à osmose inverse à bord du NGCC John P. Tully. Les dessalinisateur doivent être livrés à Sidney (Colombie-Britannique) au plus tard le 31 octobre 2027. Le contrat sera d’une durée de trois ans à compter de son attribution et comprendra des options permettant l’achat de dessalinisateurs supplémentaires pendant cette période. Un contrat sera attribué à l’offrant ayant obtenu la cote combinée la plus élevée relativement au mérite technique et au prix, dans le cadre du processus mené par l’entremise de SAP Ariba.
Transformez cet avis en décision de soumission.
Créez un profil d’entreprise pour débloquer le score de correspondance, les explications, les prochaines étapes, le suivi des occasions sauvegardées et les alertes.