Protection du littoral sud de Whitby
Résumé public
Généré ou condensé à partir du texte source importé. Vérifiez avant de soumissionner.
This appears to be an open construction tender from Fisheries and Oceans Canada for approximately 100 metres of shoreline restoration at the Whitby South Shore site in Ontario. The work potentially includes excavation and disposal of native soil, clearing and relocating trees, constructing a swale and rock berm, removing timber wharf superstructures, transporting DFO-provided riprap about 1 km from an existing stockpile, and placing the riprap according to the drawings. The tender is listed as closing October 7, 2026, at 2:00 p.m. The location information is inconsistent, showing “Whitby, Ottawa, ON”; this should be confirmed in the tender documents. The opportunity may be relevant to contractors with shoreline protection, civil construction, excavation, site clearing, rock placement, and related equipment capabilities, but businesses should review the specifications, site details, plans, invitation to tender, bonding, insurance, safety, scheduling, and submission requirements before deciding whether to bid. Verify all details and the current closing time directly in the official Canada Buys tender notice and attached documents before submitting a bid.
Aperçu des exigences
Un profil débloque la liste de vérification complète et l’explication de correspondance.
- The tender appears to involve approximately 100 m of shoreline restoration at the Whitby South Shore site in Ontario.
- The work includes excavation, removal, and disposal of native soil to specified limits.
- The work includes clearing and grubbing of existing trees in the work area.
- The work includes relocation of existing trees.
Aperçu de la description source
Le texte source importé peut contenir la mise en forme de l’avis original.
Les travaux prévus dans le cadre de ce contrat comprennent la restauration d'environ 100 m de rivage,incluant notamment : 1. L'excavation, l'enlèvement et l'élimination des sols en place jusqu'aux limites spécifiées ; 2. Le débroussaillage et le dessouchage des arbres existants dans la zone des travaux ; 3. Le déplacement d'arbres existants ; 4. La création d'un nouveau fosse de drainage (noue) ; 5. L'ajout d'une nouvelle berme en enrochement ; 6. Le démontage des superstructures en bois du quai ; 7. Le transport d'enrochements (pierres) sur une distance de 1 km, depuis le lieu de stockage actuel jusqu'au site du projet (les pierres seront fournies par le mpo) ; 8. La mise en place des nouveaux enrochements selon les traces et les niveaux indiqués sur les plans du projet.
Transformez cet avis en décision de soumission.
Créez un profil d’entreprise pour débloquer le score de correspondance, les explications, les prochaines étapes, le suivi des occasions sauvegardées et les alertes.