Asset Compound Options Analysis, Pacific Rim National Park Reserve
Public summary
Generated or condensed from imported source text. Verify before bidding.
Parks Canada Agency appears to be seeking an engineering or architecture consultant for an options analysis related to a proposed new asset compound at Pacific Rim National Park Reserve in British Columbia.The work would potentially include: comparing building options, preparing a life-cycle cost analysis for the main building, developing schematic site plans, and completing a preliminary geotechnical investigation. Subject to funding, optional work may include a climate-change risk analysis and preliminary drawings. The proposed site is near the existing PRNPR administration buildings at approximately 49.060149, -125.722714. The tender record lists British Columbia and Calgary, Alberta, so the exact delivery and administrative requirements should be confirmed in the official documents.Buyer: Parks Canada Agency Status: Open Closing date: November 3, 2026, at 3:00 p.m. [time zone should be verified]Category: Services This opportunity may be relevant to firms with appropriate engineering, architecture, site-planning, geotechnical, and life-cycle-costing experience. The available documents include the RFP, Statement of Work, and Integrity Verification Form. A business should review the complete official tender notice and all attached documents to confirm mandatory qualifications, submission instructions, insurance and security requirements, evaluation criteria, contract terms, and the applicable closing time before deciding whether to submit a bid. Bid Maple is not affiliated with the Government of Canada.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- An engineering or architecture consultant appears to be required for an options analysis concerning a new asset compound at Pacific Rim National Park Reserve (PRNPR).
- The work is expected to compare different building types for the proposed asset compound.
- The scope includes a Life Cycle Cost Analysis for the primary building.
- The scope includes preparation of schematic site plans.
Source description preview
Imported source text may contain formatting from the original notice.
Parks Canada Agency (PCA) requires an engineering or architecture consultant to complete an options analysis for the construction of a new asset compound within Pacific Rim National Park Reserve (PRNPR). PRNPR currently leases two buildings outside of the Park Reserve and is instead looking to develop the area around the existing PRNPR administration buildings at the following coordinates: 49.060149403918174, -125.72271370346736. The consultant will complete an options analysis comparing different building types, a Life Cycle Cost Analysis for the primary building, schematic site plans, and a preliminary geotechnical investigation. Depending on available funding, PCA may extend the contract to include certain optional services including a Climate Change Risk Analysis and preliminary drawings.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.
