The National Capital Commission (NCC) appears to be seeking a contractor for seasonal transportation, lifting, installation, and removal work connected with the Rideau Canal Skateway in the Ottawa/National Capital Region. The work potentially includes: - Transporting and installing seven seasonal chalets; - Transporting and installing two service trailers; - Installing one temporary electrical kiosk; - Using cranes to place four Beaver Tails trailers and related support units onto the Rideau Canal in the fall; and - Removing the equipment in the spring and returning it to storage. This opportunity may be relevant to businesses with suitable transportation equipment, cranes, lifting capacity, trained operators, project coordination capability, and experience working around temporary infrastructure, road closures, or restricted-access sites. The tender may also contain specific insurance, safety, scheduling, equipment, licensing, and experience requirements that are not included in the summary provided. This does not establish that any particular business qualifies. The tender is listed as open and is scheduled to close on September 30, 2026, at 2:00 p.m. The applicable time zone and all submission instructions should be confirmed in the official tender documents. Available documents include the RFP, chalet installation and road-closure information, photos and illustrations, chalet locations, and a pricing form. Review the complete official notice and all attachments carefully before deciding whether to bid, and verify the closing time, mandatory requirements, site conditions, safety obligations, and submission process with the official Canada Buys tender notice.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- Provide transportation, lifting, installation, and removal services for seasonal infrastructure associated with the Rideau Canal Skateway.
- Transport and install seven (7) chalets annually in the fall.
- Transport and install two (2) service trailers annually in the fall.
- Transport and install one (1) temporary electrical kiosk annually in the fall.
Source description preview
Imported source text may contain formatting from the original notice.
The National Capital Commission (NCC) requires a contractor to provide transportation, lifting, installation, and removal services for seasonal infrastructure associated with the Rideau Canal Skateway (RCS). The Work includes the annual transportation and installation of seven (7) chalets, two (2) service trailers, one (1) temporary electrical kiosk, and the craning of four (4) Beaver Tails trailers and supporting units onto the Rideau Canal in the fall, followed by their removal and return to storage in the spring.