inversion of the electric field streaming otential-controlled source electromagnetic (spCSEM) data acquired at the Aquistore site
Public summary
Generated or condensed from imported source text. Verify before bidding.
Natural Resources Canada (NRCan) is seeking a contractor to analyze electric-field spCSEM data from the Aquistore site. The work involves an equivalent point-source inversion to estimate fluid-injection strength, pressure gradients near the injection point, how pressure spreads, and changes in pressure-driven flow over time. NRCan also expects the results to help reconstruct plume boundaries, depending on what other information is available. This may be relevant to businesses with geophysical data-processing, electromagnetic inversion, or subsurface-reservoir expertise. The tender is listed as open and closes December 7, 2026, at 2:00 p.m.; the notice does not specify a time zone. The listed location includes Hamilton, Ontario, as well as broader locations. Review the official tender documents to confirm the scope, submission requirements, and deadlines before deciding whether to bid.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- Perform an inversion of the electric-field spCSEM data acquired at the Aquistore site.
- Perform an equivalent point-source SP inversion of the electrical-related data to estimate fluid injection intensity (source strength), pore-pressure gradient around the injection point, pressure propagation away from the injector, and changes in pressure-driven flow behavior over time.
- Use the calculated pressure gradients to reconstruct plume boundaries, subject to additional information.
- The tender lists a closing time of December 7, 2026, at 14:00. Confirm the applicable time zone and submission instructions in the official notice.
Source description preview
Imported source text may contain formatting from the original notice.
The objective of this work is to perform an inversion of the electric field spCSEM data acquired at the Aquistore site. An equivalent point-source SP inversion of the electrical related data should be performed to estimate a) fluid injection intensity (source strength), b) pore pressure gradient around the injection point, c) pressure propagation away from the injector, and d) changes in pressure-driven flow behavior through time. NRCan expects that the contractor uses the calculated pressure gradients to reconstruct plume boundaries (subject to additional information).
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.
