Dredging - Admirals Beach, NL
Public summary
Generated or condensed from imported source text. Verify before bidding.
This appears to be an open, two-phase procurement opportunity from Fisheries and Oceans Canada for dredging work at the Admirals Beach Small Craft Harbour in Newfoundland and Labrador. Phase 1 is a request for qualification; firms that meet the stated requirements may potentially be invited to a later bidding phase. The work may include dredging the harbour basin and channel, transporting and disposing of dredged sediment, boulders and debris at approved upland facilities, marine surveying and dredging-control services, environmental protection, and coordination with harbour users and marine traffic. The contractor is expected to provide the required labour, equipment, materials, supervision and related services. The work must be completed by March 31, 2027. The stated closing time is October 14, 2026 at 2:00 p.m.; confirm the applicable time zone and submission method in the official notice. The tender data contains an apparent location inconsistency: the project description identifies Admirals Beach, Newfoundland and Labrador, while the location metadata also refers to Ottawa, Ontario and lists Ontario as the province. Businesses with relevant marine dredging, disposal, surveying, environmental-control and harbour-operation capabilities may find this potentially relevant, but the tender record does not establish eligibility. Review the official RFQ document for mandatory qualifications, experience, environmental and disposal requirements, insurance or bonding, site conditions, pricing or future-phase procedures, and all submission deadlines before deciding whether to respond.Official document: https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/108327/30008440---request-for-qualification---services---two-phase--en.pdf. Bid Maple is not affiliated with the Government of Canada, and all details should be verified against the official tender notice before submitting a response.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- This is a two-phase selection process; the current notice describes Phase 1 as a Request for Qualification (RFQ).
- The work appears to concern the Dredging Admirals Beach Small Craft Harbour project in Admirals Beach, Newfoundland and Labrador.
- The contractor is expected to furnish all labour, plant, equipment, materials, supervision and incidentals required for the work.
- The scope includes dredging the harbour basin and channel to restore navigational depths and improve marine access.
Source description preview
Imported source text may contain formatting from the original notice.
TWO PHASE SELECTION PROCESS PHASE 1 - REQUEST FOR QUALIFICATION The scope of work for this project consists of furnishing all labour, plant, equipment, materials, supervision and incidentals required for the Dredging Admirals Beach Small Craft Harbour project at Admirals Beach, Newfoundland and Labrador. In general, the work under this contract includes, but is not necessarily limited to,the following: 1. Harbour Dredging Works – Dredging of the harbour basin and channel to restore navigational depths and improve marine access within the harbour. 2. Removal and Disposal of Dredged Material – Removal, transportation and disposal of dredged sediments, boulders, debris and other dredgable materials at approved upland disposal facilities. 3. Marine Survey and Dredging Control Services – Provision of marine survey services, dredging control and verification activities required to support the dredging operations and confirm completion of the work. 4. Environmental Protection Measures – Implementation and maintenance of environmental protection measures associated with marine construction activities, including measures to control sediment migration, protect fish habitat and prevent pollution of the surrounding marine environment. 5. Marine Operations and Harbour Coordination – Coordination of the work with harbour users and marine traffic, including the management of vessels, floating equipment and construction activities within the harbour environment. The Contractor must perform and complete the Work by March 31st , 2027.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.