BidMaple
Back to public listings
FederalConstructionCloses in 14 daysRef WS5854924910-Doc5864522770

F521A-250010 - Phase 1 - Oona River Dredging

BuyerDepartment of Public Works and Government Services (PSPC)
ClosingSep 18, 2026
Location*Canada *British Columbia, Gatineau, Quebec
CategoryConstruction
Estimated valueNot disclosed

Public summary

Generated or condensed from imported source text. Verify before bidding.

This appears to be an open PSPC construction tender for Phase 1 of dredging work at the Oona River Small Craft Harbours site in British Columbia. The project may involve maintenance dredging of the moorage basin, transporting and placing dredged material in an approved area, building temporary or staged rock berm containment, installing geotextile separation layers, constructing an unloading platform, placing topping materials, and completing environmental offsetting work such as a salt marsh and large wood debris installation. Cleanup and demobilization are expected to be completed by March 31, 2027. The listed closing date is September 18, 2026, at 2:00 p.m. The tender record identifies the category as construction and lists British Columbia and Gatineau, Quebec; however, the described work is at Oona River, B.C., and the province field shows Quebec, so the location and administrative details should be confirmed. No official notice or tender documents were provided in the listing. A business considering this opportunity should review the complete official tender notice for mandatory requirements, site conditions, environmental obligations, bonding, insurance, submission instructions, and any contractor qualifications before deciding whether to bid. This summary does not confirm eligibility or suitability.

Requirement preview

A profile unlocks the full bid checklist and match explanation.

  • The work appears to involve maintenance dredging within the Oona River Small Craft Harbours site moorage basin in Oona River, British Columbia.
  • The scope includes transportation and placement of dredged material within the designated placement area.
  • The scope includes construction of staged rock berm containment works.
  • The scope includes installation of geotextile separation layers.

Source description preview

Imported source text may contain formatting from the original notice.

Oona River dredging at Oona River, BC. The work under this project generally consists of maintenance dredging within the Oona River Small Craft Harbours site moorage basin, transportation and placement of dredged material within the designated placement area, construction of staged rock berm containment works, installation of geotextile separation layers, construction of a dredged material unload platform, placement of topping materials, and construction of the environmental offsetting salt marsh and large wood debris. All work including clean-up and demobilization must be completed by March 31 , 2027.

BidMaple is not affiliated with the Government of Canada. Always verify final requirements, dates, addenda, and documents with the official source before bidding.

Turn this listing into a bid decision.

Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.

Find my contract matches