Chalet Installation and Removals
Public summary
Generated or condensed from imported source text. Verify before bidding.
The National Capital Commission (NCC) appears to be seeking a contractor for seasonal transportation, lifting, installation, and removal work connected with the Rideau Canal Skateway in Ottawa and the National Capital Region.The work is expected to include: transporting and installing seven chalets, two service trailers, and one temporary electrical kiosk; craning four Beaver Tails trailers and related support units onto the canal in the fall; and removing and returning the equipment to storage in the spring. This opportunity may be relevant to businesses with suitable transportation, heavy-lifting or crane equipment, installation/removal crews, and the ability to coordinate work in Ottawa, including work near the Rideau Canal and possible road-closure requirements. The tender documents should be reviewed carefully for equipment specifications, access limitations, scheduling, safety requirements, insurance, past-experience requirements, pricing instructions, and any subcontracting conditions. The tender is listed as open and closes September 30, 2026, at 2:00 p.m. The available documents include the request for proposals, chalet transportation and road-closure information, photos and illustrations, chalet locations, and a pricing form. Before preparing or submitting a bid, verify the current status, complete requirements, submission method, and any amendments in the official Canada Buys tender notice and its attachments. This summary does not determine whether a business qualifies.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- The tender appears to require transportation, lifting, installation, and removal services for seasonal infrastructure associated with the Rideau Canal Skateway.
- The described fall work includes annual transportation and installation of seven (7) chalets, two (2) service trailers, and one (1) temporary electrical kiosk.
- The described fall work also includes craning four (4) BeaverTails trailers and supporting units onto the Rideau Canal.
- The described spring work includes removal of the seasonal infrastructure and return to storage.
Source description preview
Imported source text may contain formatting from the original notice.
The National Capital Commission (NCC) requires a contractor to provide transportation, lifting, installation, and removal services for seasonal infrastructure associated with the Rideau Canal Skateway (RCS). The Work includes the annual transportation and installation of seven (7) chalets, two (2) service trailers, one (1) temporary electrical kiosk, and the craning of four (4) Beaver Tails trailers and supporting units onto the Rideau Canal in the fall, followed by their removal and return to storage in the spring.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.
