New Underground Electric Service System

BuyerNational Capital Commission (NCC)
ClosingSep 28, 2026
Location*Canada, Ottawa, ON
CategoryConstruction
Estimated valueNot disclosed

Public summary

Generated or condensed from imported source text. Verify before bidding.

**Tender summary:** The National Capital Commission (NCC) appears to be seeking a contractor for a new underground electrical service system in Ottawa, Ontario. The work would support future major park events, including Winterlude. **Main work described:** - Install and energize a new main distribution cabinet. - Install a new Hydro-Québec (HQ) site service. - Provide power pedestals and connection points for temporary event hookups. - Protect significant trees during construction. - Restore the park area to an appropriate condition after the work. **Tender status:** Open **Closing date:** September 28, 2026, at 2:00 p.m. The applicable time zone and any submission requirements should be confirmed in the official documents. **Location:** Ottawa, Ontario **Category:** Construction This opportunity potentially matches businesses with relevant electrical utility, underground service, distribution equipment, civil construction, temporary-event power, and site restoration experience. Companies would likely need to review the full tender notice for mandatory qualifications, safety requirements, licensing, bonding or insurance, site conditions, technical specifications, utility coordination obligations, and submission instructions. The notice does not provide enough information here to determine whether any particular business qualifies. Review the official tender document beforedeciding to bid or submitting a response: https://canadabuys.canada.ca/sites/default/files/webform/tender_notice/105171/ncc-cs-041053-nrfp-new-underground-electric-service-system-en.pdf. The official notice should control if its details differ from this summary.

Requirement preview

A profile unlocks the full bid checklist and match explanation.

  • The work appears to involve installing and energizing a new main distribution cabinet.
  • The work appears to involve providing a new Hydro Quebec (HQ) site service.
  • The contractor is expected to provide the necessary power pedestals and connection points for temporary event connections.
  • Significant trees must be protected during the work.

Source description preview

Imported source text may contain formatting from the original notice.

Install and energize a new main distribution cabinet and new Hydro Quebec (HQ) Site Service. Provide the necessary power pedestals and connection points for temporary event connections. Protect significant trees during the work and reinstate the park to an appropriate condition at the end of the work. This will maintain the current value and uses within the park and improve the functionality to provide electrical power for major events in the future (including Winterlude).

BidMaple is not affiliated with the Government of Canada. Always verify final requirements, dates, addenda, and documents with the official source before bidding.

Turn this listing into a bid decision.

Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.

Find my contract matches