BidMaple
Back to public listings
FederalConstructionCloses in 15 daysRef cb-29-3230061

Stage 2- 2026 Lake Louise Annex Compound Roof Replacement, Banff National Park

BuyerParks Canada Agency (PC)
ClosingOct 8, 2026
Location*Alberta, *Canada, Winnipeg, MB
CategoryConstruction
Estimated valueNot disclosed

Public summary

Generated or condensed from imported source text. Verify before bidding.

Parks Canada Agency appears to be seeking bids for replacement of the roof at the Lake Louise Annex Compound in Banff National Park, Alberta. The work involves removing the existing roof to the structural decking and installing an approximately 9,120-square-foot modified two-ply bitumen flat-roof system, including insulation, a vapour barrier, flashings, vents, and drains. Approximately 1,500 square feet of water-damaged roof decking may also need replacement. This is Stage 2 of a two-stage procurement process. Only suppliers that were qualified during Stage 1 have reportedly been invited to submit the additional qualifications and financial bid required for Stage 2. The tender is listed as open and is scheduled to close on October 8, 2026, at 4:00 p.m. The listing identifies Alberta as the project location but also references Winnipeg, Manitoba, so this should be confirmed in the official documents. A business should not assume it can bid unless it received the Stage 2 invitation and meets all stated requirements. Carefully review the official tender notice, specifications, drawings, submission instructions, site conditions, insurance and bonding requirements, and any amendments before deciding whether to submit a bid. No official source or document links were provided with this listing.

Requirement preview

A profile unlocks the full bid checklist and match explanation.

  • The tender is for replacement of the roof at the Lake Louise Annex Compound building in Banff National Park, Alberta.
  • The building roof area is described as approximately 9,120 square feet.
  • The existing roof must be removed down to the structural decking.
  • The replacement roof must be a modified 2-ply bitumen flat roof system.

Source description preview

Imported source text may contain formatting from the original notice.

5P468-26-0149/A Stage 2- 2026 Lake Louise Annex Compound Roof Replacement, Banff National Park REQUIREMENT Parks Canada requires a new roof on our Lake Louise Annex Compound building (roughly 9,120 square feet). The Roof will need to be removed down to the structural decking and replaced with a modified 2-ply bitumen flat roof system including insulation, vapour barrier and replacing all flashings, vents and drains. Additionally, roughly 1500 square feet of water damaged roof decking structure will also need replacing. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.

BidMaple is not affiliated with the Government of Canada. Always verify final requirements, dates, addenda, and documents with the official source before bidding.

Turn this listing into a bid decision.

Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.

Find my contract matches