Stage 2 - Lake Annette Retaining Wall Replacement, Jasper National Park
Public summary
Generated or condensed from imported source text. Verify before bidding.
Parks Canada Agency is seeking a contractor for Stage 2 of a two-stage project to replace approximately 110 metres of retaining wall and rebuild a 2-metre-wide asphalt pathway on the Lake Annette Loop Trail in Jasper National Park, Alberta. Work is anticipated for fall 2026 and would include demolition and disposal, excavation, foundation preparation, a new segmented retaining wall with geogrid reinforcement, drainage improvements, pathway reconstruction, supervision, materials, equipment, environmental controls, and site cleanup. The site is environmentally sensitive and heavily used by visitors. Contractors would need to protect wetlands and shoreline habitat, control erosion and sediment, prepare and maintain an Environmental Protection Plan, obtain required permits, and comply with Parks Canada requirements. Revegetation and landscape restoration are excluded and will be tendered separately. This is explicitly Stage 2: only suppliers that qualified during Stage 1 were invited to submit further qualifications and a financial bid. Potential subcontractors may be able to identify themselves through the “Partner with another business” process. The stated closing time is November 10, 2026 at 3:00 p.m. The tender data lists Alberta and Winnipeg, Manitoba, while the project description identifies Jasper National Park, Alberta; the province field also appears inconsistent. Businesses should review the official tender notice and complete contract documents to confirm eligibility, bid instructions, mandatory requirements, site conditions, deadlines, and the correct submission process before pursuing or submitting a bid. No official source link or documents were provided here.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- This is Stage Two of a two-stage solicitation. Only suppliers qualified during Stage One have been invited to bid.
- Stage Two bidders are expected to provide further qualifications and a financial bid based on the project specifications and drawings.
- The work is for Parks Canada Agency and involves replacing approximately 110 m of deteriorated retaining wall along the Lake Annette Loop Trail in Jasper National Park, Alberta.
- The contractor is responsible for the labour, materials, equipment, and supervision required to complete the work.
Source description preview
Imported source text may contain formatting from the original notice.
REQUIREMENT Parks Canada Agency has a requirement for a Contractor to replace the existing retaining wall and reconstruct the adjacent pathway along the Lake Annette Loop Trail in Jasper National Park, Alberta. The project involves the replacement of approximately 110 m of deteriorated retaining wall and the reconstruction of the adjacent 2.0 m wide asphalt pathway located between Lake Annette and Ochre Lake within a high-use day-use area. Construction is anticipated to take place during Fall 2026 to reduce impacts on peak visitor use and take advantage of lower seasonal water levels. The existing natural stone retaining wall has experienced progressive deterioration, resulting in wall instability, pavement cracking, material loss, localized shoreline erosion, and reduced visitor safety. The objective of the project is to restore shoreline stability, improve visitor safety, and provide a durable, low-maintenance infrastructure solution that is compatible with the surrounding natural environment. The Contractor will be responsible for all labour, materials, equipment, and supervision necessary to complete the work, including demolition and disposal of the existing retaining wall and pathway, excavation and foundation preparation, installation of a new segmented retaining wall with geogrid reinforcement, reconstruction of the asphalt pathway, drainage improvements, and site clean-up. All work shall be carried out in accordance with the issued engineering drawings, technical specifications, environmental requirements, and contract documents. Revegetation and landscape restoration are not included in this contract and will be solicited separately. Given the environmentally sensitive nature of the site, the Contractor must minimize impacts to adjacent wetlands, shoreline habitat, and visitor-use facilities. Responsibilities will include implementing erosion and sediment control measures, preparing and maintaining an Environmental Protection Plan (EPP), obtaining all required permits, and protecting the work area throughout construction in compliance with Parks Canada environmental requirements. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid. Potential and interested sub-contractors are invited to add their company’s name under the section “Partner with another business”.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.
