Parks Canada is seeking a contractor for construction-phase upgrades to the water treatment plant control system at Riding Mountain National Park. Work includes updating SCADA and PLC systems and related equipment, programming, integration, testing, commissioning, operator training, and documentation. The work must be coordinated to keep water-treatment operations safe and continuous, and planned shutdowns or cutovers require approval. This is Stage 2 of a two-stage process. The notice says only suppliers qualified in Stage 1 have been invited to submit a further qualifications package and financial bid. Interested subcontractors are invited to seek a partner through the notice’s “Partner with another business” section. The listed closing time is December 10, 2026, at 3:00 p.m. The location information includes Riding Mountain National Park/Manitoba and Calgary, Alberta, so confirm the project location and any other details in the official tender documents. This opportunity may be relevant to businesses with suitable water-treatment controls and construction experience, but the notice does not establish that any particular business qualifies. Verify eligibility, requirements, and submission instructions with the official tender notice before bidding.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- This is Stage Two of a two-stage solicitation. Only suppliers qualified during Stage One have been invited to submit a Stage Two bid; confirm the business is among the invited suppliers before proceeding.
- The contractor is expected to act as a General Contractor for construction-phase upgrades to the Water Treatment Plant control system at Riding Mountain National Park.
- The work includes upgrading existing SCADA and PLC systems and associated hardware, software, control panels, communications, electrical connections, operator interfaces, and field-device integration.
- The contractor is expected to supply and install equipment; develop or modify PLC and SCADA programming; integrate the upgraded system with existing plant processes and instrumentation; and complete testing, start-up, commissioning, operator training, and closeout documentation.
Source description preview
Imported source text may contain formatting from the original notice.
REQUIREMENT Parks Canada requires a qualified General Contractor to complete construction-phase upgrades to the Water Treatment Plant control system at Riding Mountain National Park. The work includes upgrading the existing Supervisory Control and Data Acquisition (SCADA) and Programmable Logic Controller (PLC) systems, together with associated hardware, software, control panels, communications, electrical connections, operator interfaces, and field-device integration. The Construction Contractor will supply and install the required equipment; develop or modify PLC and SCADA programming; integrate the upgraded system with existing plant processes and instrumentation; complete testing, start-up, commissioning, operator training, and closeout documentation; and correct deficiencies. All work must be coordinated with Parks Canada and plant operators to maintain safe and continuous water-treatment operations. Planned shutdowns, system cutovers, and temporary control arrangements require prior approval. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid. Potential and interested sub-contractors are invited to add their company’s name under the section “Partner with another business”.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.