COOP Wharf Elevation Works at L'Étang-du-Nord Fishing Harbour, Magdalen Islands, Quebec
Public summary
Generated or condensed from imported source text. Verify before bidding.
This appears to be an open DFO construction tender for elevating and rebuilding the COOP Wharf at L’Étang-du-Nord Fishing Harbour in the Magdalen Islands, Quebec. The stated closing time is November 12, 2026 at 1:00 p.m. The tender may be relevant to businesses with experience in marine and harbour construction, timber crib wharves, dredging and contaminated sediment handling, demolition, granular foundations, civil utilities, paving, electrical distribution, lighting, and potable-water systems. The work is described as including partial demolition of existing wharves; reuse of recovered stone; installation of containment curtains and floating booms; excavation of contaminated seabed sediments; construction of new ACC-treated timber crib wharves; riprap demolition; widening and paving of the wharf approach; stockpiling, characterization, disposal or authorized beneficial use of dredged materials; and installation of electrical and water services. The listed project location is L’Étang-du-Nord, Magdalen Islands, Quebec, although the tender record also shows a broader location listing that includes Prince Edward Island, Quebec outside the National Capital Region, and Ottawa. The available documents include the invitation to tender, plans, and specifications. Review the complete official tender notice and all attachments for mandatory site conditions, environmental requirements, security or insurance provisions, bonding, submission instructions, schedules, and any applicable subcontracting or experience requirements. Confirm all details directly in the official Canada Buys documents before deciding whether to submit a bid.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- The tender appears to require partial demolition of existing wharves and reuse of recovered stone.
- The work appears to include installation of a containment curtain and floating boom during demolition or dredging to retain driftwood and suspended particles.
- The work appears to include excavation of contaminated seabed sediments for preparation of the granular foundation.
- The work appears to include installation of granular foundations for new timber crib wharves.
Source description preview
Imported source text may contain formatting from the original notice.
The elevation works for the COOP Wharf at L’Étang-du-Nord Fishing Harbour in the Magdalen Islands include, but are not limited to, the following work: • Partial demolition of existing wharves and reuse of recovered stone. • Installation of a containment curtain and a floating boom to retain driftwood and suspended particles during wharf demolition or dredging activities required for preparation of the granular foundation. • Excavation of the seabed (contaminated sediments) to allow for the installation of the granular foundation for the new crib structures. • Work required for the installation of the granular foundation of the new timber crib wharves. • Supply of all materials required for the construction of ACC-treated timber crib wharves. • Demolition of the riprap protection on one side of the wharf approach. • Placement of pit run and granular materials for the widening of the wharf approach. • Stockpiling (according to potential contamination) and characterization of dredged materials to construct the granular base for the new crib structures. • Disposal and/or beneficial use of dredged sediments at authorized sites. • Civil works for the installation of electrical and potable water services to the new wharf. • Paving works for the wharf approach. • Supply and installation of electrical distribution, lighting and water system components.