Wharf Reconstruction Phase II – Port au Choix, NL
Public summary
Generated or condensed from imported source text. Verify before bidding.
Fisheries and Oceans Canada is seeking bids for Phase II reconstruction of approximately 73.2 metres of wharf at Port au Choix, Newfoundland and Labrador. The work includes site preparation and partial demolition, dredging, timber cribwork and rock placement, electrical service and lighting, paving, concrete wharf and upland slabs, drainage, scour protection, and removal and reinstallation of a retaining wall. Completion is anticipated by March 31, 2029. Bidders are advised to visit the site and review the specified health and safety requirements before doing so. This may be relevant to businesses with marine construction, civil, dredging, electrical, or related capabilities, potentially as a prime contractor or subcontractor. The listing gives a closing time of December 1, 2026 at 2:00 p.m.,but its location fields conflict: the title and scope identify Port au Choix, NL, while the location and province fields say Ottawa, Ontario. Confirm the correct location, deadline, requirements, and any updates in the official tender notice and attached documents before deciding whether to bid or submitting a bid.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- The tender lists a closing time of December 1, 2026 at 14:00. Confirm the time zone and submission instructions in the official tender documents.
- The work is to reconstruct approximately 73.2 metres of the marginal wharf at Port au Choix, Newfoundland and Labrador, in accordance with the specifications, drawings, and contract terms.
- The contractor is to furnish the plant, labour, equipment, and materials needed for the work.
- The described work includes site mobilization and demobilization; excavation; partial demolition and removal of existing crib work; hauling and disposal; and survey work to set out the new work.
Source description preview
Imported source text may contain formatting from the original notice.
1. TITLE Wharf Reconstruction – Port au Choix, NL for Fisheries and Oceans Canada (DFO) 2. SCOPE OF WORK The work covered consists of the furnishing of all plant, labour, equipment and material for the reconstruction of approximately 73.2 meters of the marginal wharf at Port au Choix, NL in accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract. In general, the work under this contract consists of, but will not necessarily be limited to, the following: • Site Work including mobilization, demobilization, excavation, partial demolition and removal of existing crib work, hauling, and disposal offsite and onsite. • Required survey to set location of new Work as indicated on the drawings. • Dredging of overburden sediments from the harbour bottom to reach bedrock in the footprint of the rock mattress to be placed for the crib work. • Construction of timber cribwork on a placed rock mattress with associated rock ballast, fendering, wheelguard and blocking, Type “A” cleats and blocks, and ladders. • Electrical work as required and detailed for the provision of street lights, shore power pedestals and the installation of a new 600 AMP single phase electrical service. • Supply and placement of new quarried rock fill and Class “A” and Class “B” granular material. • Supply and placement of new asphalt pavement. • Supply and placement of scour protection. • Construction of reinforced concrete wharf deck and upland slab on grade. • Supply and placement of catch basins with outlet pipes for site drainage. • Removal, salvage and reinstallation of a precast concrete block retaining wall. 3. FAMILIARIZATION WITH SITE Before submitting a bid, it is recommended that bidders visit the site and its surroundings to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders or those they invite to site are to review specification Section 01 35 28 - Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. 4. CONTRACT PERIOD It is anticipated the contractor can perform and complete the work no later than March 31, 2029. All work shall be completed in accordance with the Contract Documents.