Whtiby South Shore Protection
Public summary
Generated or condensed from imported source text. Verify before bidding.
This appears to be an open construction tender from Fisheries and Oceans Canada for approximately 100 metres of shoreline restoration at the Whitby South Shore site in Ontario. The work potentially includes excavation and disposal of native soil, clearing and relocating trees, constructing a swale and rock berm, removing timber wharf superstructures, transporting DFO-provided riprap about 1 km from an existing stockpile, and placing the riprap according to the drawings. The tender is listed as closing October 7, 2026, at 2:00 p.m. The location information is inconsistent, showing “Whitby, Ottawa, ON”; this should be confirmed in the tender documents. The opportunity may be relevant to contractors with shoreline protection, civil construction, excavation, site clearing, rock placement, and related equipment capabilities, but businesses should review the specifications, site details, plans, invitation to tender, bonding, insurance, safety, scheduling, and submission requirements before deciding whether to bid. Verify all details and the current closing time directly in the official Canada Buys tender notice and attached documents before submitting a bid.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- The tender appears to involve approximately 100 m of shoreline restoration at the Whitby South Shore site in Ontario.
- The work includes excavation, removal, and disposal of native soil to specified limits.
- The work includes clearing and grubbing of existing trees in the work area.
- The work includes relocation of existing trees.
Source description preview
Imported source text may contain formatting from the original notice.
The work under this contract includes approximately 100m of shoreline restoration including,but not limited to: 1. Excavation and removal and disposal of native soil to specified limits; 2. Clearing and grubbing of existing trees in the work area; 3. Relocation of existing trees; 4. Introduction of a new swale; 5. Addition of a new rock berm; 6. .Removal of wharf timber superstructures; 7. Transportation of Riprap 1km from existing stockpile location to project site. Riprap stone to be provided by DFO; 8. Placement of new rip rap to lines and grades as indicated on the project drawings.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.
