Design and Construction of a Modular Office Complex, CFB Edmonton
Public summary
Generated or condensed from imported source text. Verify before bidding.
Defence Construction Canada (DCC) appears to be seeking proposals from design-build teams for a new 250-person modular office complex at CFB Edmonton. The project would use a modified design-build approach, with an estimated construction value of approximately $14.8 million. The opportunity is listed as open, with proposals due through the MERX Electronic Bidding System by October 14, 2026, at 2:00 p.m. The tender data identifies Ottawa, Ontario as the location, but the project description identifies CFB Edmonton, Alberta. This discrepancy should be confirmed in the official RFP documents. The required team may involve architects, sustainable-design specialists, structural, mechanical, electrical, civil or municipal engineers, technologists, project managers, a superintendent, an Indigenous relations coordinator, and an industrial security manager. The tender information includes hourly-rate categories for these roles, suggesting that detailed team composition and pricing requirements will be set out in the RFP. A selected contractor will be required to hold a valid Designated Organization Screening (DOS) issued through PSPC’s Contract Security Program. Security requirements are reportedly detailed in Amendment No. 1. The procurement is being conducted under CFTA, CETA, and WTO-GPA requirements. Potentially interested businesses should review the complete RFP, amendments, mandatory qualifications, insurance and bonding requirements, security rules, submission instructions, and any teaming or subcontracting provisions. Questions must be sent only to the point of contact named in the advertisement; contacting others during the solicitation period could result in disqualification.Official source: https://www.merx.com/public/solicitations/4069202205/abstract?language=EN This summary is based on the tender information provided and does not determine whether a business qualifies. Verify the official MERX notice and all RFP amendments before deciding to bid or submitting a proposal.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- Submit a proposal through the MERX Electronic Bidding System by the closing date and time shown in the electronic bidding system; the notice lists October 14, 2026 at 14:00:00.
- The opportunity is for a Design-Build Team to design and construct a new 250-person modular office complex at CFB Edmonton under a modified design-build approach.
- The selected contractor will be required to hold a valid Designated Organization Screening (DOS) issued by the Contract Security Program within Public Services and Procurement Canada.
- Review Amendment No. 1 to the RFP documents for the project’s detailed security requirements.
Source description preview
Imported source text may contain formatting from the original notice.
DEFENCE CONSTRUCTION CANADA (DCC) is requesting Proposals from Design-Build Teams to design and construct a new 250-person modular office complex at CFB Edmonton following a modified design-build approach. Additional details are provided in the Request for Proposals (RFP) documents. The estimated construction cost for this opportunity is in the range of $14.8 million. Firms that consider themselves qualified to provide these services are invited to submit their proposals through the MERX Electronic Bidding System on or before the closing date and time indicated on the Electronic Bidding System. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). The selected contractor will be required to hold a valid Designated Organization Screening (DOS), issued by the Contract Security Program (CSP) within Public Services and Procurement Canada (PSPC). Details concerning the Security Requirements for this project are identified in Amendment No.1 to the RFP documents. Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement. Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified. Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.code : 1.01description : Design Team Lead Chef de l’équipe de conceptionunit Of Measure : Hourly Ratecode : 1.02description : Lead Architect Architecte principalunit Of Measure : Hourly Ratecode : 1.03description : Senior Architect Architecte seniorunit Of Measure : Hourly Ratecode : 1.04description : Intermediate Architect Architecte intermédiaireunit Of Measure : Hourly Ratecode : 1.05description : Lead Sustainable Designer Spécialisé enconception durable principalunit Of Measure: Hourly Ratecode : 1.06description : Senior Sustainable Designer Spécialiste senior de la conception durableunit Of Measure: Hourly Ratecode : 1.07description : Intermediate Sustainable Designer Spécialiste intermédiaire de la conception durableunit Of Measure: Hourly Ratecode : 1.08description : Lead Structural Engineer Ingénieur en structure principalunit Of Measure: Hourly Ratecode : 1.09description : Senior Structural Engineer Ingénieur en structure seniorunit Of Measure : Hourly Ratecode : 1.10description : Intermediate Structural Engineer Ingénieur en structure intermédiaireunit Of Measure : Hourly Ratecode : 1.11description : Lead Mechanical Engineer Ingénieur mécanique principalunit Of Measure : Hourly Ratecode : 1.12description : Senior Mechanical Engineer Ingénieur mécanicien seniorunit Of Measure : Hourly Ratecode : 1.13description : Intermediate Mechanical Engineer Ingénieur mécanicien intermédiaireunit Of Measure : Hourly Ratecode : 1.14description : Lead Electrical Engineer Ingénieur électrique principalunit Of Measure : Hourly Ratecode : 1.15description : Senior Electrical Engineer Ingénieur électricien seniorunit Of Measure : Hourly Ratecode : 1.16description : Intermediate Electrical Engineer Ingénieur électricien intermédiaireunit Of Measure : Hourly Ratecode : 1.17description : Lead Civil or Municipal Engineer Ingénieurcivil ou municipal principalunit Of Measure: Hourly Ratecode : 1.18description : Senior Civil or Municipal Engineer Ingénieur civil ou municipal seniorunit Of Measure: Hourly Ratecode : 1.19description : Intermediate Civil or Municipal Engineer Ingénieur civil intermédiaireunit Of Measure : Hourly Ratecode : 1.20description : Senior Architectural or Engineering Technologist / Technician / Draftsperson Technologue, technicien ou dessinateur sénior en architecture ou en génieunit Of Measure : Hourly Ratecode : 1.21description : Intermediate Architectural or Engineering Technologist/Technician/Draftsperson Technologue, technicien ou dessinateur intermédiaire en architecture ou en génieunit Of Measure : Hourly Ratecode : 1.22description : Project Manager Gestionnaire de projetunit Of Measure : Hourly Ratecode : 1.23description : Superintendent Surintendantunit Of Measure : Hourly Ratecode : 1.24description : Indigenous Relations Coordinator Coordonnateur des relations avec les Autochtonesunit Of Measure: Hourly Ratecode : 1.25description : Industrial Security Manager Responsable de la sécuritéindustrielleunit Of Measure : Hourly Ratecode : 1.26description : TOTAL CLASSIFICATION RATE TAUX HORAIRE PONDÉRÉTOTALunit Of Measure : Hourly Ratecode : 2description : Maximum Upset Fee for the Contract Award Scope of Services Honoraire maximum pour l’étendue des services visés par l’attribution du contratunit Of Measure : Dollarcode : 3.01description : Maximum Upset Unit Travel Rate to CFB Edmonton Coût unitaire de déplacementmaximum vers la BFC Edmontonunit Of Measure: Dollarcode : 3.02description : Estimated Cost of Travel for the Contract Award Scope of Services Coût de déplacement estimatif pour l’étendue des services visés par l’attribution du contratunit Of Measure : Dollarcode : 4description : Design-Builder Mark-Up Allowance Allocation majorée du concepteur-constructeurratio Type : MARKUPunit Of Measure : Percentcode : 5cost Allowance Price : 25000.00description : Prime Cost Allowance Allocation budgétairequantity : 1Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Turn this listing into a bid decision.
Build a company profile to unlock match scoring, explanations, checklist next steps, saved opportunity tracking, and alerts.
