**Tender: Wharf Reconstruction – L’Orignal, Ontario** The Department of Fisheries and Oceans (DFO) is seeking a contractor for the replacement and reconstruction of a wharf in L’Orignal, approximately 90 km east of Ottawa, on the south side of the Ottawa River. The tender is listed as open and closes **October 1, 2026, at 2:00 p.m.** The work appears relevant to businesses with experience in marine construction, wharf or timber crib construction, demolition, concrete work, shoreline protection, excavation, and site restoration. The project is proposed to be carried out between **October 2026 and March 2027**. 主要 work includes: - Demolishing and disposing of the existing wharf and related infrastructure. - Removing, storing, and reinstalling the existing boat launch ramp. - Salvaging and reusing existing ballast materials. - Building new timber crib wharf structures with decking, curbs, fenders, and mooring hardware. - Excavation, foundation preparation, geotextile installation, and placement of granular, stone, and erosion-protection materials. - Constructing reinforced concrete elements. - Grading, shoreline restoration, and reinstatement of disturbed areas. Optional work may include an additional timber crib structure and armour stone protection. Bidders may inspect the site at their own expense and should assess access, site conditions, weather exposure, soil conditions, required accommodations, risks, and other factors that could affect pricing. Appropriate safety measures are required during any site visit. The available tender documents include the invitation to tender, specifications, and drawings. Review these documents carefully for mandatory requirements, bonding or insurance provisions, submission instructions, schedule details, and any site-visit or environmental requirements. The provided listing identifies Ottawa as the location, but the actual work site is in L’Orignal; confirm all location and project details in the official tender notice. This summary does not confirm that any particular business qualifies or can meet the requirements. Verify the complete official notice and documents before submitting a bid.
Requirement preview
A profile unlocks the full bid checklist and match explanation.
- The tender appears to require demolition and removal of the existing wharf structures and associated infrastructure, including disposal of demolished materials.
- The work includes removal, salvage, temporary storage, and reinstatement of the existing boat launch ramp and associated components.
- Existing ballast materials are to be salvaged, stored, and reinstalled for incorporation into the reconstructed wharf structures.
- The project includes construction of new timber crib wharf structures, including structural timber components, decking, curbs, fender systems, mooring hardware, and associated works.
Source description preview
Imported source text may contain formatting from the original notice.
Wharf Replacement, L’Orignal, ON In general, the work covered under this project includes all labour, all products (i.e.: materials, machinery, equipment and appliances), all construction materials and all services that may be necessary for the execution of the work in accordance with the contractual documents. The project site is located in L’Orignal approximately 90 kilometers east of Ottawa. The work area is located at the end of Wharf Street on the south side of the Ottawa River. Work under this Contract covers, but is not limited to,the following: 1. Demolition and removal of the existing wharf structures and associated infrastructure, including the disposal of demolished materials. 2. Removal, salvage, temporary storage, and reinstatement of the existing boat launch ramp and associated components. 3. Salvage, storage, and reinstallation of existing ballast materials for incorporation into the reconstructed wharf structures. 4. Construction of new timber crib wharf structures, including the supply and installation of structural timber components, decking, curbs, fender systems, mooring hardware, and associated works. 5. Excavation, preparation of foundation areas, placement of geotextile materials, and installation of granular, stone, and erosion protection materials required to support the reconstructed facilities. 6. Construction of reinforced concrete elements associated with the reconstructed wharf and access areas. 7. Site grading, shoreline restoration, reinstatement of disturbed areas, and completion of all ancillary works necessary to provide a fully operational marine facility. 8.Optional Work: a. Supply and installation of one additional timber crib structure. b. Supply and installation of armour stone protection. Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. The work is proposed to be completed between the months of October 2026 and March 2027.